{"id":16993,"date":"2026-01-15T16:17:21","date_gmt":"2026-01-15T15:17:21","guid":{"rendered":"https:\/\/isleutilities.com\/?p=16993"},"modified":"2026-01-15T16:23:45","modified_gmt":"2026-01-15T15:23:45","slug":"the-trial-reservoirs-initiative-four-years-on","status":"publish","type":"post","link":"https:\/\/isleutilities.com\/es\/the-trial-reservoirs-initiative-four-years-on\/","title":{"rendered":"The Trial Reservoirs Initiative Four Years On"},"content":{"rendered":"<section class=\"l-section wpb_row height_large\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-12 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><h2><b>A Milestone for Turning Water Innovation Into Adoption<\/b><\/h2>\n<p>&nbsp;<\/p>\n<h3><b>The problem we set out to solve<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Four years ago, in the aftermath of yet another global climate summit heavy on ambition but depressingly light on delivery, the Trial Reservoirs Initiative was conceived to challenge the water sector\u2019s most persistent failure: the gap between proving a technology works and actually using it. We knew lack of innovation wasn\u2019t the problem; the sector was rich in proven but unfamiliar solutions. What was missing was a reliable mechanism to move from \u201cthis worked\u201d to \u201cthis is now how we operate\u201d.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Technologies are routinely demonstrated successfully only to stall when commitment is required. Utilities invest time in trials, generate credible results, and then return to business as usual. Measured by adoption rather than experimentation, the sector\u2019s track record has been stubbornly poor. This is a failure of process rather than a failure of engineering or ambition. Consequently, our goal was not to run better pilots, but how to design trials that make inaction the harder choice.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That challenge shaped everything that followed. The Trial Reservoirs Initiative was created to reverse the status quo, and to accept failure where technologies do not deliver, but require action where they do. In late 2021, this moved from theory into practice with the launch of the Climate Change Trial Reservoir &#8211;\u00a0 a model built explicitly to shorten the distance between testing something new and making it business as usual.<\/span><\/p>\n<h3><b>From idea to impact: what four years of trials have delivered<\/b><\/h3>\n<\/div><\/div><div class=\"w-image align_center\"><div class=\"w-image-h\"><img decoding=\"async\" width=\"1634\" height=\"2560\" src=\"https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Infographic-Trial-Reservoirs-Impact-VERTICAL-scaled.png\" class=\"attachment-full size-full\" alt=\"Infographic - The Trial Reservoirs Initiative Four Years On\" loading=\"lazy\" srcset=\"https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Infographic-Trial-Reservoirs-Impact-VERTICAL-scaled.png 1634w, https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Infographic-Trial-Reservoirs-Impact-VERTICAL-191x300.png 191w, https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Infographic-Trial-Reservoirs-Impact-VERTICAL-654x1024.png 654w, https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Infographic-Trial-Reservoirs-Impact-VERTICAL-8x12.png 8w\" sizes=\"auto, (max-width: 1634px) 100vw, 1634px\" \/><\/div><\/div><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\"><p><span style=\"font-weight: 400;\">Four years on, the Initiative has launched 20 globally, with 17 completed to date. Of those, 12 (70%) concluded successfully. More importantly, that performance has translated into adoption, with 12 technologies now commercially deployed in real systems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For those interested in the numbers, the Initiative has helped deliver 188.2 tonnes of CO\u2082e savings per year across five trials with quantified carbon impacts, and has avoided around 565 tonnes of CO\u2082e cumulatively since 2021. Crucially, these savings are locked in through adoption, continuing long after the trials end.<\/span><\/p>\n<h3><b>Delivering commitment to change<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">While we\u2019re immensely proud of the individual trials, their real value lies in shifting normal practice. Our largest carbon savings consistently come from a few levers: using less energy to deliver the same outcome, reducing transport, and cutting water use where it equates to energy demand.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The operating model is designed for scale. Through framework contracts, a single successful trial can unlock rollout across multiple comparable assets,. Based on our current pipeline of more than 450 technologies, there is a credible pathway to around 65,000 tonnes of CO\u2082e saved per year, with the potential to exceed 100,000 tonnes annually as adoption spreads.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">To put that in context, 65,000 tonnes of CO\u2082e per year is roughly equivalent to burning 25 million litres of diesel. In the water sector, these savings are small, cumulative changes: fewer sludge tankers on the road, treatment works drawing slightly less power hour after hour, pumps running less often, and processes optimised once and then left to do their job. Scaled across assets, regions, and organisations, these incremental gains quietly become the new normal.<\/span><\/p>\n<h3><b>Why the model works across a diverse water sector<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The Initiative succeeds because it is built for difference. The water cycle involves complex physical, chemical, and biological processes that rarely behave in predictable ways. Instead of trying to smooth out that complexity, our model works with it, holding steady across very different parts of the system.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That range of contexts doesn\u2019t mean starting from scratch each time. What matters is getting the trial right, and this the magic of our Trial &amp; Purchase Agreement (T&amp;PA). The T&amp;PA is flexible regarding trial execution but rigid on objective performance measures. Trials are designed to be scientifically robust and proportionate, and to run only for as long as it takes to reach a decision. We don\u2019t default to a six-month trial. In some cases, six months isn\u2019t nearly enough; in others, clear conclusions can be reached in a matter of weeks. Trial design, key performance indicators,\u00a0 monitoring, and post-trial commitments are shaped around the technology and its setting, rather than squeezed into a \u2018one size fits all\u2019 template.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The philosophy is simple: try it, determine objectively whether it worked, and if it did, use it. While implementation is rarely simple, the principles apply across the system.<\/span><\/p>\n<h3><b>How the model has matured<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The model has evolved as we\u2019ve learned what works and what doesn\u2019t. When trials haven\u2019t progressed as hoped, we\u2019ve adjusted the model to address the underlying reasons. We\u2019ve had five trials that did not proceed to implementation and while that was disappointing, each one made the Initiative stronger. In most cases, the technology itself wasn\u2019t the problem; it was the context around it that proved harder than expected.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Two lessons stand out. First, change inside water organisations rarely follows a straight line. Running a trial is often achievable; embedding something new into day-to-day operations is much harder. It takes time, ownership, and sustained attention. This is where the Trial &amp; Purchase Agreement has been crucial, setting expectations and commitments upfront instead of relying on goodwill once a trial ends.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Second, a technology can work well and still struggle with real world constraints, such as\u00a0 supply chains, or bespoke components. Likewise, if baselines or operating conditions aren\u2019t properly understood, even robust technologies can falter. We now test assumptions early, rather than uncovering constraints when it\u2019s too late to change course.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">To this point, we have learned that time spent on setup is rarely wasted. A rushed trial with no credible path to adoption is far less useful than deciding not to proceed at all. A recent trial in Brazil illustrates this clearly. The setup phase took nearly two years; the trial itself ran for just eight weeks. This balance was intentional. Rather than rushing into testing, the teams focused on understanding the site, validating assumptions, and being clear about what success would look like. While a utility could initiate a trial much faster without a T&amp;PA, the picture can become murky when the trial ends, even if it goes well. Real world constraints then surface and utilities often spend years working out whether and how to implement \u2013 by which point the original rationale and momentum may well have evaporated. While a two year setup phase may \u2018feel\u2019 long, the result is a trial that will progress seamlessly to implementation, rather than being shelved once the pilot has concluded.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The model is now more realistic, more resilient, and designed to work within the realities utilities face.<\/span><\/p>\n<h3><b>What this milestone means for the sector<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">There is no escaping the fact that changing operational systems is difficult. Assets are long-lived, risks are real, and capacity is constrained. That difficulty is precisely why the sector has become adept at piloting without adopting. However, we have seen that when trials are established with clear objectives, and an agreed route to implementation, organisations follow through. Not because it is easy, but because the structure makes commitment unavoidable once uncertainty has been removed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The diversity of technologies progressed through the Trial Reservoirs Initiative reiterates that the barrier has never been the science. It has been the way we as a sector trial, decide, and commit. This milestone demonstrates that a different approach is not only possible, but repeatable, and that it\u2019s possible for adoption to become part of normal practice.<\/span><\/p>\n<h3><b>Looking ahead<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Things have changed for us too. By 2025, it was clear that while the model was working, it needed to scale faster to match the urgency of the climate and water challenges ahead. Twelve new technologies working their magic out in the wild is a feat, but it\u2019s not enough. That led to the Trial Reservoirs Initiative evolving into an independent not-for-profit as part of the <\/span><a href=\"https:\/\/techascendfoundation.org\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Tech Ascend Foundation<\/span><\/a><span style=\"font-weight: 400;\">. This change is opening new avenues for philanthropic and mission-aligned funding to continue to accelerate adoption. This shift means that our individual Reservoirs can be replenished more reliably and deployed where they are most needed.<\/span><\/p>\n<h3><b>What this means for utilities\u00a0<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">For utilities considering the Initiative, our message from the last four years is this: this is not an innovation programme designed to generate pilots for their own sake. It is a decision-making mechanism designed to generate change.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Our model works within the realities of regulatory oversight, procurement rules, operational risk, and limited room for blue sky thinking. We don\u2019t ask organisations to take reckless bets, but we do ask them to be decisive when the evidence justifies it. In return, the Initiative supports the outcomes utilities are already under pressure to deliver: net zero carbon, improved efficiency, resilience, and better value for customers.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ultimately, the value of the Trial Reservoirs Initiative is not that it produces successful pilots. It is that it shortens the gap between learning and action. For utilities that are serious about moving beyond trials and embedding new ways of working, the message from four years of practice is clear: adoption at pace is possible, but only when commitment is designed in from the start.<\/span><\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row us_custom_5cd26a65 height_large\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_flex valign_top type_default stacking_default\"><div class=\"vc_col-sm-12 wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\"><\/div><\/div><\/div><\/div><\/div><\/section>","protected":false},"excerpt":{"rendered":"<p>Four years on, the Trial Reservoirs Initiative marks a milestone in turning water innovation into adoption across utilities and the wider water sector.<\/p>","protected":false},"author":28,"featured_media":17002,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"categories":[117],"tags":[],"class_list":["post-16993","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-trial-reservoir"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Trial Reservoirs Initiative Four Years On | Isle Utilities<\/title>\n<meta name=\"description\" content=\"Four years on, the Trial Reservoirs Initiative marks a milestone in turning water innovation into adoption across utilities and the wider water sector\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/isleutilities.com\/es\/the-trial-reservoirs-initiative-four-years-on\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Trial Reservoirs Initiative Four Years On | Isle Utilities\" \/>\n<meta property=\"og:description\" content=\"Four years on, the Trial Reservoirs Initiative marks a milestone in turning water innovation into adoption across utilities and the wider water sector\" \/>\n<meta property=\"og:url\" content=\"https:\/\/isleutilities.com\/es\/the-trial-reservoirs-initiative-four-years-on\/\" \/>\n<meta property=\"og:site_name\" content=\"Isle Utilities\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-15T15:17:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-15T15:23:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Water-Utility-Innovation-Adoption.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Mariana\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mariana\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/\"},\"author\":{\"name\":\"Mariana\",\"@id\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/#\\\/schema\\\/person\\\/19415177c4a14eedeebdf4f8867c67a9\"},\"headline\":\"The Trial Reservoirs Initiative Four Years On\",\"datePublished\":\"2026-01-15T15:17:21+00:00\",\"dateModified\":\"2026-01-15T15:23:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/\"},\"wordCount\":1581,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/isleutilities.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Water-Utility-Innovation-Adoption.png\",\"articleSection\":[\"Trial Reservoir\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/\",\"url\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/\",\"name\":\"The Trial Reservoirs Initiative Four Years On | Isle Utilities\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/isleutilities.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Water-Utility-Innovation-Adoption.png\",\"datePublished\":\"2026-01-15T15:17:21+00:00\",\"dateModified\":\"2026-01-15T15:23:45+00:00\",\"description\":\"Four years on, the Trial Reservoirs Initiative marks a milestone in turning water innovation into adoption across utilities and the wider water sector\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/#primaryimage\",\"url\":\"https:\\\/\\\/isleutilities.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Water-Utility-Innovation-Adoption.png\",\"contentUrl\":\"https:\\\/\\\/isleutilities.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Water-Utility-Innovation-Adoption.png\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/isleutilities.com\\\/the-trial-reservoirs-initiative-four-years-on\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/isleutilities.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Trial Reservoirs Initiative Four Years On\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/#website\",\"url\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/\",\"name\":\"Isle Utilities\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/#organization\"},\"alternateName\":\"Isle\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/#organization\",\"name\":\"Isle Utilities\",\"alternateName\":\"Isle\",\"url\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/isleutilities.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/icon.png\",\"contentUrl\":\"https:\\\/\\\/isleutilities.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/icon.png\",\"width\":500,\"height\":500,\"caption\":\"Isle Utilities\"},\"image\":{\"@id\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/isleutilities.com\\\/pt\\\/#\\\/schema\\\/person\\\/19415177c4a14eedeebdf4f8867c67a9\",\"name\":\"Mariana\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6099903780369ccc3dc7a9e6c69efc1b43d0f6cb3d3f91fb384fd613d0157c10?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6099903780369ccc3dc7a9e6c69efc1b43d0f6cb3d3f91fb384fd613d0157c10?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6099903780369ccc3dc7a9e6c69efc1b43d0f6cb3d3f91fb384fd613d0157c10?s=96&d=mm&r=g\",\"caption\":\"Mariana\"},\"description\":\"Communications and Marketing Consultant\",\"url\":\"https:\\\/\\\/isleutilities.com\\\/es\\\/author\\\/mariana-zito\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Trial Reservoirs Initiative Four Years On | Isle Utilities","description":"Four years on, the Trial Reservoirs Initiative marks a milestone in turning water innovation into adoption across utilities and the wider water sector","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/isleutilities.com\/es\/the-trial-reservoirs-initiative-four-years-on\/","og_locale":"es_ES","og_type":"article","og_title":"The Trial Reservoirs Initiative Four Years On | Isle Utilities","og_description":"Four years on, the Trial Reservoirs Initiative marks a milestone in turning water innovation into adoption across utilities and the wider water sector","og_url":"https:\/\/isleutilities.com\/es\/the-trial-reservoirs-initiative-four-years-on\/","og_site_name":"Isle Utilities","article_published_time":"2026-01-15T15:17:21+00:00","article_modified_time":"2026-01-15T15:23:45+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Water-Utility-Innovation-Adoption.png","type":"image\/png"}],"author":"Mariana","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Mariana","Tiempo de lectura":"7 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/#article","isPartOf":{"@id":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/"},"author":{"name":"Mariana","@id":"https:\/\/isleutilities.com\/pt\/#\/schema\/person\/19415177c4a14eedeebdf4f8867c67a9"},"headline":"The Trial Reservoirs Initiative Four Years On","datePublished":"2026-01-15T15:17:21+00:00","dateModified":"2026-01-15T15:23:45+00:00","mainEntityOfPage":{"@id":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/"},"wordCount":1581,"commentCount":0,"publisher":{"@id":"https:\/\/isleutilities.com\/pt\/#organization"},"image":{"@id":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/#primaryimage"},"thumbnailUrl":"https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Water-Utility-Innovation-Adoption.png","articleSection":["Trial Reservoir"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/","url":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/","name":"The Trial Reservoirs Initiative Four Years On | Isle Utilities","isPartOf":{"@id":"https:\/\/isleutilities.com\/pt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/#primaryimage"},"image":{"@id":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/#primaryimage"},"thumbnailUrl":"https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Water-Utility-Innovation-Adoption.png","datePublished":"2026-01-15T15:17:21+00:00","dateModified":"2026-01-15T15:23:45+00:00","description":"Four years on, the Trial Reservoirs Initiative marks a milestone in turning water innovation into adoption across utilities and the wider water sector","breadcrumb":{"@id":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/#primaryimage","url":"https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Water-Utility-Innovation-Adoption.png","contentUrl":"https:\/\/isleutilities.com\/wp-content\/uploads\/2026\/01\/Water-Utility-Innovation-Adoption.png","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/isleutilities.com\/the-trial-reservoirs-initiative-four-years-on\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/isleutilities.com\/"},{"@type":"ListItem","position":2,"name":"The Trial Reservoirs Initiative Four Years On"}]},{"@type":"WebSite","@id":"https:\/\/isleutilities.com\/pt\/#website","url":"https:\/\/isleutilities.com\/pt\/","name":"Isle Utilities","description":"","publisher":{"@id":"https:\/\/isleutilities.com\/pt\/#organization"},"alternateName":"Isle","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/isleutilities.com\/pt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/isleutilities.com\/pt\/#organization","name":"Isle Utilities","alternateName":"Isle","url":"https:\/\/isleutilities.com\/pt\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/isleutilities.com\/pt\/#\/schema\/logo\/image\/","url":"https:\/\/isleutilities.com\/wp-content\/uploads\/2022\/06\/icon.png","contentUrl":"https:\/\/isleutilities.com\/wp-content\/uploads\/2022\/06\/icon.png","width":500,"height":500,"caption":"Isle Utilities"},"image":{"@id":"https:\/\/isleutilities.com\/pt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/isleutilities.com\/pt\/#\/schema\/person\/19415177c4a14eedeebdf4f8867c67a9","name":"Mariana","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/6099903780369ccc3dc7a9e6c69efc1b43d0f6cb3d3f91fb384fd613d0157c10?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6099903780369ccc3dc7a9e6c69efc1b43d0f6cb3d3f91fb384fd613d0157c10?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6099903780369ccc3dc7a9e6c69efc1b43d0f6cb3d3f91fb384fd613d0157c10?s=96&d=mm&r=g","caption":"Mariana"},"description":"Consultor de comunicaci\u00f3n y marketing","url":"https:\/\/isleutilities.com\/es\/author\/mariana-zito\/"}]}},"_links":{"self":[{"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/posts\/16993","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/comments?post=16993"}],"version-history":[{"count":11,"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/posts\/16993\/revisions"}],"predecessor-version":[{"id":17006,"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/posts\/16993\/revisions\/17006"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/media\/17002"}],"wp:attachment":[{"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/media?parent=16993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/categories?post=16993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/isleutilities.com\/es\/wp-json\/wp\/v2\/tags?post=16993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}